Integrated BIM based Cost Schedule Management (4D+5D) Solution

In BIM based business management (Integrated Cost Schedule Management), manual matching between resources and processes, which reach hundreds to tens of thousands of BIM objects, is a very difficult task practically.
As Bexel Manager solved the linkage among BIM objects, resources and process activities with a breakthrough way, developed to be practically possible BIM based cost schedule integrated management, it is a product that has been successfully applied not only in architecture but also in various industries such as roads, bridges, and plants.

Interworking and collaboration with other systems is smooth using the OpenBIM standard, and has excellent expandability to
4D (+ process), 5D (+ cost), and 6D (+ maintenance) based on the 3D model, and supports various report formats.

  • 3D BIM

    - Quantity Calculation
    - Collision Detection
    - Interference Management
    - BIM Meta-data Management
    - Bid Package Preparation

  • 4D BIM

    - Scheduling & Planning
    - Construction Simulation
    - Critical Path Methods & Analysis
    - Progress Rate Tracking
    - Plan vs. Actual

  • 5D BIM

    - Cost Estimation & Budget Appropriation
    - 5D Project Planning
    - Quantity Statement
    - 5D Progress Rate Tracking
    - Cash Flow Analysis

  • 6D BIM

    - Facility Management (FM)
    - Intelligent Document Connectivity
    - Document Management System
    - Asset Model Data

Applied Case

  • D Company, A Project
    Quantity Calculation & Cost Basis Visual Check
  • D Company, A Project
    Quantity Calculation & Cost Basis Visual Check
  • D Company, A Project
    Quantity, Cost & Schedule (Execution vs. Plan) Integrated Management & Simulation