본문 바로가기

BIM

BIM

BIM Services

BIM Engineering Service

Classification
Transition Design (2D to 3D BIM)
Construction Drawing Task (Construction Drawing Preparation)
Construction Simulation
BIM based Quantity Calculation & Quotation
Details
Building Construction/Structure/MEP Modeling Preparation
BIM based Design Document Preparation
Interference Review By Engineering Type
Drawing Errors & Omissions Review
Interference Review Report Preparation
BIM based Quantity Calculation (Framework, Finish)
BIM based Process Management (4D/5D)

BIM Application Development

Classification
BIM Library Development (BIM Library for Productivity)
Add-on Development (Productivity Enhancement)
Details
Modeling Tool Add-on Development
Subsidiary Materials Management Tool Add-on Development
Building Construction/Structure/MEP/Landscape Library Development
Various Data Based Library Development

Transition Design
(2D to 3D BIM)

Service Contents
  • - 3D Model Preparation Based on 2D Drawing
  • - Interference Review within engineering type and by the engineering type
  • - Interference Review Report Preparation
Expected Effects
  • - Consistency Secure Between Drawings
  • - Quality Improvement Through Drawing Errors Review

BIM based Drawing

Service Contents
  • - 2D Drawing Preparation Using BIM Model
  • - Business Consultation Through Visual Materials
Expected Effects
  • - Consistency Secure Between Drawings
  • - Productivity Improvement In Case of Design Change
  • - Construction Phase BIM Interworking Available

Construction Simulation

Service Contents
  • - Interference Review & Construct Ability Review Between Engineering Types
  • - Progress Management & 4D Simulation
  • - Process Simulation & Construction Support
Expected Effects
  • - Rework Minimization Due to Interference Between Engineering Types
  • - Equipment Operation Plan Review

BIM based Quantity Calculation & Quotation

Service Contents
  • - Framework Quantity Calculation (Rebar, Concrete, Cast)
  • - Construction Finish Quantity Calculation (Unit Household, Public Use Hall, Exterior, Underground Parking Lot, Subsidiary Facilities, Neighborhood Living Facilities)
  • - Calculation Quantity (Framework, Building Construction) Based History Interworking Task Proceeding
Expected Effects
  • - Rework Minimization Due to Interference Between Engineering Types
  • - Equipment Operation Plan Review