메인콘텐츠
BIM Engineering Service
- Classification
- Transition Design (2D to 3D BIM)
- Construction Drawing Task (Construction Drawing Preparation)
- Construction Simulation
- BIM based Quantity Calculation & Quotation
- Details
- Building Construction/Structure/MEP Modeling Preparation
- BIM based Design Document Preparation
- Interference Review By Engineering Type
- Drawing Errors & Omissions Review
- Interference Review Report Preparation
- BIM based Quantity Calculation (Structural, Finish)
- BIM based Process Management (4D/5D)
BIM Application Development
- Classification
- BIM Library Development (BIM Library for Productivity)
- Add-on Development (Productivity Enhancement)
- Details
- Modeling Tool Add-on Development
- Subsidiary Materials Management Tool Add-on Development
- Building Construction/Structure/MEP/Landscape Library Development
- Various Data Based Library Development
Transition Design
(2D to 3D BIM)
- Service Contents
-
- - 3D Model Preparation Based on 2D Drawing
- - Interference Review within engineering type and by the engineering type
- - Interference Review Report Preparation
- Expected Effects
-
- - Consistency Secure Between Drawings
- - Quality Improvement Through Drawing Errors Review
BIM based Drawing
- Service Contents
-
- - 2D Drawing Preparation Using BIM Model
- - Business Consultation Through Visual Materials
- Expected Effects
-
- - Consistency Secure Between Drawings
- - Productivity Improvement In Case of Design Change
- - Construction Phase BIM Interworking Available
Construction Simulation
- Service Contents
-
- - Interference Review & Construct Ability Review Between Engineering Types
- - Progress Management & 4D Simulation
- - Process Simulation & Construction Support
- Expected Effects
-
- - Rework Minimization Due to Interference Between Engineering Types
- - Equipment Operation Plan Review
BIM based Quantity Calculation & Quotation
- Service Contents
-
- - Framework Quantity Calculation (Rebar, Concrete, Cast)
- - Construction Finish Quantity Calculation (Unit Household, Public Use Hall, Exterior, Underground Parking Lot, Subsidiary Facilities, Neighborhood Living Facilities)
- - Calculation Quantity (Framework, Building Construction) Based History Interworking Task Proceeding
- Expected Effects
-
- - Rework Minimization Due to Interference Between Engineering Types
- - Equipment Operation Plan Review